Case study · North Mountain, Phoenix
Open Shower Ceiling Patched, Textured and Blended In
A bathroom ceiling open to the framing, patched, textured to match and repainted so the repair disappears.

- Area
- North Mountain, Phoenix
- Room
- Bathroom, above the tub and shower
- Repairs
- Ceiling opening, plus two peeling wall spots
- Job photos
- One morning, April 2020
The challenge
A homeowner in Phoenix's North Mountain area called JAE about damage above a bathtub. A rectangular section of the bathroom ceiling was open to the framing, and the painted band between the tub surround and the ceiling had peeled down to bare patches in two places. A plain patch would have left a smooth square on a textured ceiling, as obvious as the hole.
Our approach
Alvaro's crew fitted a new piece of drywall into the opening and taped the seams. The top of the tub surround was masked with paper and tape, and the shower head was wrapped so it stayed clean. The peeling spots on the wall band were patched, then the new ceiling section and the wall band were textured to match the surrounding surface and sanded at the edges. Once primed, the ceiling and the wall band were repainted so the repair would blend.
The result
The opening is gone. In the finished photos, the ceiling runs unbroken from wall to wall, the texture carries across where the hole was, and the wall band is one even color. The job photos span about three hours on a single morning in April 2020, from the open ceiling to the finished shower. The work carries JAE's 1-year warranty.
Before and After


Along the way







